Telecons of the GEOSS AI Pilot Plenary are listed below in reverse chronological order.



Next Telecon

DATE: Tuesday, 15 July 2008
TIME: 13:00:00 UTC
Check your local time
WebEx logistics are provided below .
  • CFP activity
    • Clarification telecon, July 18
  • AIP Phase 2 Kickoff Workshop
    • 25-26 September, Boulder Colorado, USA
    • Location: NCAR Mesa Laboratory
    • With ADC-8 and other GEO Meetings
    • Purpose of AIP Kickoff:
      • Meet other Participants in AIP
      • Refine architecture of Annex B based upon CFP responses
      • Plan AIP Phase 2 activities into 2009
  • AIP Milestones and Schedule
    • CFP finalized: June 26
    • CFP announcement by GEOSec: TBD
    • CFP Clarification Telecon: July 18
    • CFP Responses for Kickoff due: Sept 1
    • Kickoff workshop: 25-26 Sept in Boulder Colorado, USA
    • Status and Interim results to GEO Plenary: November
    • AIP Phase 2 augmentation results: 2009
  • Any other business
    • GML and JAXB for Energy Schema - message to AIP Plenary
      • http://lists.opengeospatial.org/pipermail/aip_plenary/2008-June/000114.html
      • "We are using the libraries java/jboss implementing JAXB."
      • "When we include GML schema, (we need at least "PointType" and
        "BoundingBox"), the translation of specifications into Java skeleton
        fails. This happens for version 3.1.1 and 3.2.1."
      • Message forwarded to OGC GML DWG
      • Answer from Galdos
    • Next Telecon, TBD 1300 UTC



Previous Telecons

Date Topics Discussed
2008 Jun 24
AIP-2 CFP Final Draft approved, AIP-2 Kickoff Workshop, GML and JAXB
2008 Jun 17 CFP Initial Draft, Plan for CFP Development, AIP Phase 2 Kickoff Workshop
2008 Jun 3 ADC-7 Results, GEOSS Common Infrastructure, CFP Rough Draft, AIP Milestones and Schedule
2008 May 13 GEOSS Common Infrastructure, CFP-2008 outline and work plan, AIP Milestones and Schedule, Task Sheet, ADC-7 prep
2008 May 6
GEOSS Common Infrastructure, CFP-2008 Outline, and work plan, AIP Milestones and Schedule, Task Sheet

2008 Apr 29

GEOSS Common Infrastructure, Review of CFP-2008 Outline, AIP Milestones and Schedule

2008 Apr 22

GEOSS Common Infrastructure, Themes for CFP-2008 , Lead editors for CFP-2008, AIP Milestones, GEOSS Workshops

2008 Apr 08

GEOSS Common Infrastructure, Open discussion of the activities of the AIP to support OP1

2008 Feb 12

Architecture Workshop Summary - February 3&4, ADC-6 Meeting Summary - February 5&6, Architecture Implementation Pilot Next steps

2008 Jan 22

ADC meeting and Architecture Workshop Planning, Call for Position Papers

2008 Jan 08

Architecture Workshop Planning, Call for Position Papers, EGU and IGARSS conference announcements

 

 



Telecon: Tuesday, 24 June 2008

Discussions
  • Review of CFP Final Draft
    • AIP Phase 2 CFP Final draft
    • Main Body and Annex B have been updated to version 20080624
    • Final draft of the three volumes were reviewed; several actions were agreed.
    • MOTION: It was unanimously agreed that the CFP is compete after implementation of the actions.
    • ADC and GEO Secretariat reviews and announcements
  • AIP Phase 2 Kickoff Workshop
    • 25-26 September, Boulder Colorado, USA
    • Location: NCAR Mesa Laboratory
    • With ADC-8 and other GEO Meetings
    • Purpose of AIP Kickoff:
      • Meet other Participants in AIP
      • Refine architecture of Annex B based upon CFP responses
      • Plan AIP Phase 2 activities into 2009
  • AIP Milestones and Schedule
    • CFP Final Draft: June 20 - done
    • CFP web page finalized: June 25
    • CFP announcement by GEOSec: June 25 - TBD
    • CFP Clarification Telecon: July 18
    • CFP Responses for Kickoff due: Sept 1
    • Kickoff workshop: 25-26 Sept in Boulder Colorado, USA
    • Status and Interim results to GEO Plenary: November
    • AIP Phase 2 augmentation results: 2009
  • Any other business
    • GML and JAXB for Energy Schema - message to AIP Plenary
      • http://lists.opengeospatial.org/pipermail/aip_plenary/2008-June/000114.html
      • "We are using the libraries java/jboss implementing JAXB."
      • "When we include GML schema, (we need at least "PointType" and
        "BoundingBox"), the translation of specifications into Java skeleton
        fails. This happens for version 3.1.1 and 3.2.1."
      • Message forwarded to OGC GML DWG
    • Next Telecon, 15 July 1300 UTC



Telecon: Tuesday, 17 June 2008

Discussions
  • Review of CFP Initial Draft
    • AIP Phase 2 CFP Annex B Initial Draft posted 20080606
    • AIP Annex B working draft 20080617f
      • This version includes multiple inputs merged using MS Word Merge function.
      • It is messy but shows the things we need to discuss during the telecon.
      • Inputs merged from: Nebert, Walther, Albani, Lieberman
    • We had a very constructive telecon today to review the CFP. We got about half way through Annex B. Interested persons are encouraged to review the edits on the Computational, Engineering and Technology viewpoints and provide comments.
    • The version of the CFP Annex B - Architecture edited during the telecon is now posted:
  • The near term plan for CFP Development:
  • "Near-Final" version to be posted on Friday, June 20
  • Near-final CFP to include Main Body, Annex A and Annex B
  • - Near-final will be announced to the AIP Plenary and ADC Co-chairs
  • - Comments on near-final sent to Percivall will be incorporated before June 24 telecon.
  • - Aim to get final approval of CFP by AIP Plenary during telecon on Tuesday, June 24
  • - Inputs from JoshL, SteveB, DougN (registry class diagram) needed on Wednesday June 18th.
  • - George and Larry to discuss Enterprise models this week. Larry please suggest a time/date.
  • AIP Phase 2 Kickoff Workshop
    • 25-26 September, Boulder Colorado, USA
    • NCAR Mesa Laboratory
      • The Mesa Lab sits outside and overlooking the city of Boulder
      • Renting a car for your transportation is recommended.
      • Visitor Parking at Mesa Lab is limited so we will investigate car pooling.
    • Logistics being developed
    • Kickoff to be held just after the ADC-8 Meeting.
    • Purpose of AIP Kickoff:
      • Meet other Participants in AIP
      • Refine architecture of Annex B based upon CFP responses
      • Plan AIP Phase 2 activities into 2009
  • AIP Milestones and Schedule
    • CFP Rough Draft: May - Complete
    • CFP inputs due by end of May - 80%
    • CFP Initial Draft: 3 June - Complete
    • CFP Final Draft: June 20
    • CFP announcement by GEOSec: June 25
    • CFP Responses for Kickoff due: Sept 1
    • Kickoff workshop: 25-26 Sept in Boulder Colorado, USA
    • Status and Interim results to GEO Plenary: November
    • Final OP1 augmentation results: 2009
  • Any other business
    • Next Telecon, 24 June 1300 UTC



Telecon: Tuesday, 3 June 2008

Discussions
  • ADC-7 Results
    • AR-07-02 Task presentation to ADC-7
      • Thanks to Doug Nebert, Larry McGovern, Herve´Caumont
    • Discussions
      • scope and overlap and interaction of the AIP, the IOC phase (year), and the proposed Task Force.
      • user requirements and best practices registries in the GEOSS Common Infrastructure
      • CFP to emphasize users ability to access services based upon registry search results.
      • CFP to emphasize application schemas for EO products
      • role of ebRIM for broader set of registered items: CRS, SLD, schemas
    • AIP Kickoff agreed to be on 25-26 Sept in Boulder Colorado, USA
      • Co-located with ADC-8
      • Logistics to be developed.
  • Update on GEOSS Common Infrastructure
  • Review of CFP Rough Draft
    • rough draft of CFP Annex B - Architecture
    • About half of the CFP inputs for sections have been received.
      • Thanks to those that have sent inputs. Others, please send yours today if possible
    • "What is written without effort is in general read without pleasure" - Samuel Johnson
  • AIP Milestones and Schedule
    • CFP Rough Draft: May - Complete
    • CFP inputs due by end of May - 50%
    • CFP Final Draft: early June
    • CFP announcement by GEOSec: June
    • CFP Responses for Kickoff due: August
    • Kickoff workshop: 25-26 Sept in Boulder Colorado, USA
    • Status and Interim results to GEO Plenary: November
    • Final OP1 augmentation results: 2009
  • Any other business
    • Next Telecon, 17 June 1300 UTC

 



Telecon: Tuesday, 13 May 2008

Discussion
  • Update on GEOSS Common Infrastructure
    • Letters have been sent to GCI inviting contributions for GCI components: ESRI, Compusult, ESA, FAO, IEEE, GMU
    • A group is being formed of 10 members to lead the GCI evaluation : 4 from ADC and 2 from each of the other committees.
    • Telecon later in May of the group will develop Terms of Reference for the evaluation group.
    • The evaluation will emphasis logistics and operations. The GCI evaluation will be separate from the AIP IOC Augmentation. GCI evaluation will focus on sustainable aspects. AIP is focus is on IOC augmentation and refinement of components in practice.
    • The AIP CFP will follow the GCI in showing an interface between the GEO Portal and the GEOSS Component Registry.
  • Review of CFP Outline and work plan for development
    • 20080512 version of plan.doc
    • Test Facility for Service Registration was discussed based upon results of the February workshop. It is anticiapted that it will be a distributed Test Facility with components contributed by multiple organizations. The facility may reuse components from the existing OGC Compliance Test facility. The GEOSS Test Facility will not be performing OGC compliance tests. OGC Compliance certification can only be achieved using the test facility hosted by OGC and its members. The GEOSS Test Facility purpose is to support registration of services in the GEOSS registry and to achieve interoperability in the operational GEOSS network. The GEOSS facility may also provide the status checking of operational services.
    • Criteria for persistent, operational services were discussed. A version of the criteria will be presented at the ADC meeting next week.
    • UIC/ADC Air Quality Scenario Workshop
      • Question about geographic region: has the geographic region for the scenarios been chosen? Discussion was that the scenarios should be written so that they could be applied to any geographic location. Geographic areas of interest for the demonstrations will be initially discussed at the Kickoff Workshop.
    • ACTION: George Percivall to draft an initial version of the CFP for 2008.
    • ACTION: lead editors for the sections of the CFP are to provide input to G. Percivall by the end of May.
  • Discussion of AIP Milestones and Schedule
    • several items affecting the schedule so the dates are not firm
    • CFP inputs due by end of May
    • CFP Inital Draft: May
    • CFP Final Draft: early June
    • CFP announcement by GEOSec: June (TBR)
    • CFP Responses for Kickoff due: end of June or early July (TBR)
    • Kickoff workshop: 2 days in September (Boulder?)
      • There was discussion that September was a busy month and perhaps the kickoff should be moved to August.
      • Discussion was that perhaps the workshop should be in October to allow for more preparation to make the workshop effective.
      • There was comment that we do not want to make the Kickoff too late.
    • Status and Interim results to GEO Plenary: November
    • Final OP1 augmentation results: 2009
  • GEO AR-07-02 Task Sheet
    • GEOSS Workshops as separate task
    • Comments on the existing task sheet were requested.
    • Task sheet update has now (16 May) been submitted to the GEO Secretariat.
  • ADC-7 meeting in Geneva, May 20 & 21
    • Presentation of AR-07-02 will be done by Doug Nebert, Herve´Caumont, and Larry McGovern.
    • George Percivall will prepare a presenation package with inputs from Doug, Herve´and Larry.
    • George will not be able to attend the ADC-7

 

 

 



Telecon: Tuesday, 6 May 2008

Discussion
  • Update on GEOSS Common Infrastructure
    • Not discussed as several persons were not available due to trouble with webex call in line
  • Review of CFP Outline and work plan for development
    • The CFP plan has been updated since last week:
    • Began discussion this week with the Engineering Viewpoint
      • The traceability between the various viewpoints of the CFP Architecture needs to be addressed. The RM-ODP standards has requirements for relations between viewpoints.
      • ACTION: need to have discussion about traceability between viewpoints at future telecon.
    • Sensor Web in Section 4 - Ingo Simonis presented his ideas for CFP
      • Stuart Frye commented about recent NASA-ESTO work that is relevant to Sensor Web. Stuart to check if the information can be sent to Ingo, George, Larry.
    • Inter-calibration: we have had confirmation that CEOS continues to work on this topic and we believe that Stephen Ungar will be able to contribute to the CFP but this is not confirmed.
    • Ingo suggested that we drop CORBA and COM from the service description methods and perhaps add J2EE. George commented that the list of service definition languages comes from the GEOSS 10 Year Plan Reference Document.
  • Discussion of AIP Milestones and Schedule
    • several items affecting the schedule so the dates are not firm
    • CFP Inital Draft: end of May (TBR)
    • CFP Final Draft: early June (TBR)
    • CFP announcement by GEOSec: June (TBR)
    • CFP Responses for Kickoff due: end of June or early July (TBR)
    • Kickoff workshop: 2 days in September (Boulder?)
    • Status and Interim results to GEO Plenary: November
    • Final OP1 augmentation results: 2009
  • GEO AR-07-02 Task Sheet
    • Task Sheet update due May 15th to the GEO Secretariat from each of the Task POCs
    • Send any comments to George (percivall@myogc.org) on the Current Task Sheet that was last updated Feb 2008
  • Any other business
    • ADC-7 meeting in Geneva, May 20 & 21: several people will be attending. George Percivall is not able to attend but will work with other members of the team to provide an update on AIP to the meeting.
    • Next Telecon, 13 May 1300 UTC - Note that the time was requested to be moved one hour earlier to de-conflict with other meetings.



2008 April 29 - Telecon

DATE: Tuesday, 29 April 2008
TIME: 14:00:00 UTC
Discussion
  • Update on GEOSS Common Infrastructure:
    • Invitation letter to portal candidates is under review by ExCom via e-mail.
    • Composition of team(s) to review portals and to guide operations is under discussion.
  • Review of CFP Outline and work plan for development
    • Add section on new registries, e.g., Best Practices
    • Scenarios to include UML model prepared by Larry McGovern with each scenario leader.
    • There is interest in drought, in particular expressed by several persons from the US. David Arctur (darctur@ogcii.org) continues to develop the water management scenario for purposes other than AIP at this time. Interested persons should contact David.
    • Intercalibration remains of high interest to CEOS with upcoming meetings on the topic. Ken McDonald offered to provide contact information to George Percivall.
    • Metadata for GEO is a continuing topic - coordinate with GEO Task DA-06-04.
  • Discussion of AIP Milestones and Schedule
    • CFP Final Draft: end of May (TBR)
    • CFP announcement by GEOSec: end of May (TBR)
    • CFP Responses for Kickoff due: end of June or early July (TBR)
    • Kickoff workshop: 2 days in September (Boulder?)
    • Status and Interim results to GEO Plenary: November
    • Final OP1 augmentation results: 2009
  • Any other business



2008 April 22 - Telecon

DATE: Tuesday,22 April 2008
TIME: 14:00:00 UTC
Discussion
  • Update on GEOSS Common Infrastructure:
    • ADC Co-Chairs e-mail regarding status of Testing plan
    • GEOSEC testing plan memo
    • ADC Co-Chairs response for testing plan memo
    • GEOSec to send letter to GEO-all announcing/reminding that the registries are on-line and available (Doug Nebert has provided draft letter.)
  • Themes to be considered in developing a CFP for OP1 Augmentation:
    • Support Common Infrastructure Establishment Process
      • Initial Operating Capability (IOC) now established
      • Operating Phase 1 (OP1) planned for one-year duration.
      • AIP outcome to augment the IOC
    • Confirm open process for AIP
      • AIP outcome to support SBA tasks in using IOC and architecture
      • Development process is iterative; Anyone can join at anytime
      • Retain structure within a phase; e.g. kickoff, integration
    • Continue UIC/ADC collaboration,
      • SBAs emphasis as initially identified in Cape Town
      • Continue collaboration from Architecture Workshop, Feb 08
      • Identify operational SBA functionality to support persistence
    • Emphasize operational persistence; "persistent exemplars" ;
      • Networks of operational services linked using the GEOSS ADC Architecture
      • Deliver augmentations to AR-07-01 - Operations
      • Demonstrating cross-application use: services used beyond their original purpose.
      • Doug reinforced the importance of operational persistence for OP1.
    • Build on work done in 2007
  • Lead editors for sections of CFP-2008
    • SBA Scenarios
      • Disaster Response: Guy Sequin
        • Stuart Frye commented about recent work by CEOS on this topic that will support Guy's input to the CFP.
      • Air Quality : John White
      • Biodiversity: Doug Muchoney, et.al.
      • Energy - Solar: Lionel Menard
      • Enterprise Modeling of scenarios: Larry McGovern
        • Discussion of the variable behavior of the Clearinghouse: distributed search vs. harvest in advance. Larry sees that the scenarios are identifying requirements. George P. commented about the trade study about the topic in the Architecture Implementation Report. Several people expressed previous experience with the topic.
        • ACTION: send any comments on the topic to Doug Nebert, Josh Lieberman, Larry McGovern. They will use the material for developing the CFP topics and direction.
        • There was discussion about how to use UML in RM-ODP. After the telecon Larry found an ISO standard for the topic: ISO ISO/IEC 19793 Use of UML for ODP system specifications. ISO 19793 will be used as a guide for use of UML in the CFP.
      • Template for Scenarios
    • Other Topics
      • Catalogs, registry: Doug Nebert, Josh Lieberman
        • Doug: Clearinghouse definition and behavior will be a signficant portion of AIP OP1 activities.
        • Discussion that Best Practice Registry and User Requirements are to be added to CFP architecture.
        • Siri Jodha Singh Khalsa: IEEE has responded to Best Practice Registry CFP and has begun to implement the registry.
      • Sensor Web: Ingo Simonis
        • Sensor Web work will be coordinated with GEO Sensor Web Task (POC: Terence van Zyl)
        • Outputs of GEOSS Sensor Web Workshop will be used in CFP.
      • Workflow: TBC
      • Inter-calibration: TBC
    • Other: Percivall and (Hervé Caumont ERDAS/OGC)
  • Discussion of AIP Milestones and Schedule
    • The milestones are defined but the dates are not.
    • CFP Release:
    • Responses to CFP due:
    • Kickoff workshop: 2 days in September (Boulder?)
    • Interim results at GEO Plenary: November
    • Final OP1 augmentation results: 2009
  • GEOSS Workshops
    • XXI-Air Quality and Health Jul 02, 2008 Beijing, China
    • XXII - Air Quality and coastal ecosystems (weather forecasting) Jul 06, 2008 Boston, MA, USA
    • XXIII - Science Modeling & Data Policy Sep 14, 2008 Quebec City, Canada
    • XXIV - Water Security and Ecosystems Oct 27, 2008 ACCRA Ghana
    • XXV - Architecture of GEOSS, 1 day in week of 1 Dec 2008 -Valencia, Spain
  • Any other business
    • Next AIP telecon: 29 April 1400 UTC (1300 UTC was considered but after discussion 1400 was retained.)
    • Request by Frank Lindsay to focus on scenarios next week; George -this will be happen as part of detailed CFP discussion next week.
    • Osamu: be sure that the CFP emphasizes the services support multiple SBAs; agreed.

 



2008 April 8 - Telecon

DATE: Tuesday, 8 April 2008
TIME: 14:00:00 UTC
Discussions
  • Update on GEOSS Common Infrastructure:
    • The GEOSS Common Infrastructure Process paper was presented to the GEO ExCom, March 26/27.
    • The ExCom agreed that an Initial Operation Capability (IOC) should begin on about 1 May 2008. This will mark the beginning of GEOSS Operations Phase 1 (OP1). During OP1 an evaluation will be conducted on the Common Infrastructure IOC with an emphasis on GEO Portal. A task force (separate from AR-07-02) will be established for the evaluation. Letter agreements with the 3 GEO Portal Providers will be developed.
    • The ExCom also discussed: a search interface to the Clearinghouse; open source or proprietary code as a criteria.
  • Open discussion of the activities of the AIP to support OP1
    • Ideas for the relationship of the AIP to the IOC were discussed. Initial thoughts are that the AIP would augment the IOC with additional services and architecture. During OP1 it is anticipated that the will be flexibility in the components that will allow further development, adaptation and refinement of the architecture developed for IOC. OP1 should be viewed as a phase in a long term process of development of all the components of the Common Infrastructure but also the other components and services of the architecture.
    • During OP1 it will be necessary to continue development and refinement of the search capability across the community catalogues. This work will need to consider the differing vocabulary and metadata schemas implying the need for a broker functionality perhaps using the workflow services.
    • The AIP Process will need to support convergence and consistency across the diversity of contributions from the many participants. Focusing on the Societal Benefit areas will aid this focus. Also the process of CFP, CFP responses and Kickoff workshop for OP1 will bring focus to common areas of development. Formation of Working groups for AIP/OP1 will be useful to aid this convergence.
    • There was general support for an emphasis on "persistent exemplars" ; networks of services based on operational services linked together using the GEOSS ADC Architecture developed in 2007. Contributions by GEO Members with persistent services will be key to this.
    • A plan for developing the Call for Participation was briefly discussed. The plan makes use of the CFP from 2007. G. Percivall is enlisting contributions to the CFP development, e.g., scenarios from the architecture workshop. The CFP will remain open for the entirity of OP1, while urging responses to the CPF in time for planning the Kickoff Workshop. Developing an Open Call for Participation in AIP-2008
  • Discussion of AIP Schedule
    • The milestones are defined but the dates are not.
    • CFP Release:
    • Responses to CFP due:
    • Kickoff workshop: 2 days
    • Interim results at GEO Plenary: November
    • Final OP1 augmentation results
  • Any other business
    • Next AIP telecon: 22 April

 



2008 February 12 - Telecon

DATE: Tuesday, 12 February 2008
TIME: 14:00:00 UTC

Discussions
  • Architecture Workshop Summary - February 3&4
    • Overall Agenda of Workshop
    • Presentations for nearly all sessions are now posted in the pages linked to the overall agenda.
    • Water Scenario was discussed in telecon: contact Session leader David Arctur (darctur@ogcii.org) if you are interested in contributing or participating in the Water Scenario
  • ADC-6 Meeting Summary - February 5&6
    • Task AR-07-02 presentation to ADC-6
    • GEOSS Common Infrastructure Establishment Process paper
      • Discussion of Version 0 of the paper as presented by Jose Achache at ADC-6
      • Presented a revised Figure 1 with "GEOSS Common Infrastructure" including GEO Portal, Clearinghouse, and Registries
      • Questions and comments raised in the telecon discussion:
        • How can comments by the Task team be submitted?
        • How might ESRI and Compusult participate independent of a member or a participating organization.
        • OGC's role is as point of contact for GEO Task AR-07-02.
        • GEO Secretariat is conducting the establishment process.
        • The Establishment process and Task AR-07-02 are GEO activities.
    • AIP Scenarios and process
      • During ADC-6 there was an emphasis requested that the AIP focus on operational or nearly -operational deployments of solutions, designed by those with the problem being solved.
      • The role of AIP is to work with members, participating organizations and other GEO tasks to enhance the operational systems use of the GEOSS architecture.
      • The workshop scenarios identified jointly by UIC and ADC will be refined to meet this objective.
      • Emphasis needs to be made that the AIP process is open; there has been a perception that no participants could join after the CFP last year - this was an incorrect perception.
  • Architecture Implementation Pilot Next steps
      • The Draft Schedule presented at ADC-6 will need to be revised once the establishment process matures
      • Table 1 in Section 5 of the process paper Version 0 shows the schedule
        • Providers established by July 1
        • Version 0 of components in place by end of 2008
    • Clarity on the process is anticipated to increase in March.
      • Review of process: C4 meeting Feb 18 & 19
      • Decision on process anticipated by ExCom 12 in March
    • CFP will need to be consistent with the Establishment process.
      • Therefore the CFP may be as early as April and as late as June
      • The kickoff may be as early as June and as late as September.
  • Any other business



2008 January 22 - Telecon

DATE: Tuesday, 22 January 2008
TIME: 14:00:00 UTC
Check your local time
WebEx logistics are provided below .

Actions from the Telecon
  • ACTION: All Session Leaders to develop draft scenarios before the workshop - Complete.
  • ACTION: All are invited to post or provide position papers on topics for the sessions - Complete.
  • ACTION: Revise agenda to deconflict Test Facility and Workflow sessions - Complete.
  • ACTION: Percivall to invite Els LeDrew to provide an UIC statement during the Opening Session - Complete.
  • ACTION: All to aid in completing and correcting the table on task coordination - Complete.
  • ACTION: Percivall to send Muchoney information about the Agriculture Monitoring scenario developers - Complete.
Discussion:
  • ADC meeting and Architecture Workshop Logistics
  • Architecture Workshop, Feb 4 and 5
  • ADC-6 meeting, Feb 6 and 7
  • Both hosted by EC/JRC, Ispra, Italy
  • Participants should have registered before 15 January 2008.
    • Approximately 40 people are registered, so parallel sessions should be about 10-15 people which is a good size.
    • Registration is now closed. You can still contribute by sending a position paper (see below)
  • Workshop Sessions
  • Agenda and session descriptions - draft:
    • ACTION: All Session Leaders to develop draft scenarios before the workshop
  • UIC/ADC Scenario sessions
    • Air Quality and Health: John White
      • Rudy Husar will contribute to development - see comment on session page.
    • Nautral Disaster Response: Guy Séguin
      • Previous dicussions with Guy and others have led to a generalization from "hurricanes" to "natural disasters"
      • Guy provided a position paper that is posted as a comment on the session page.
    • Energy - Solar: Lionel Menard
      • Lionel reviewed the scenario that is posted on the session page.
      • See new comment and position paper from Andrew Woolf on session page
    • Biodiversity: Douglas Muchoney, et. al.
      • Based on telecon earlier today, scenario will focus on "species modeling for protected areas."
      • IP3 Team will co-lead the session and will have posted plans for IP3 development - see comment on session page.
    • Water/Drought monitoring: David Arctur
      • David is contacting several persons to support development of scenario.
  • Intercalibration Scenario - Stephen Ungar
    • Stephen is developing scenario; will send link to CEOS working paper as background on the topic of intercalibration.
    • DA-06-02 "Data Quality Assurance Framework" was identified as the domain Task for coordination.
  • Implementation Sessions
    • Initial Operating Capability: Doug Nebert
    • Clearinghouse, Catalogues, Registries: Doug Nebert
    • User Portals and Applications: Ingo Simonis
    • Test Facility and Service Registration: Paul Smits
    • Sensors Interoperability: Ingo Simonis
    • Workflow: Pier Giorgio Marchetti
      • Workflow will assume a Persistent Test Bed for testing and extenstions
      • Grid processing will benefit the processing needs in the workflow session.
      • Pier Giorgio to provide papers for reference on the session page.
    • Request to hold the Test Facility and Workflow sessions at separate times.
      • ACTION: Revise agenda to deconflict Test Facility and Workflow sessions - Done.
  • Opening and Closing Plenaries
    • Opening Session updated to incorporate Portal/Clearinghouse discussion into Recap of 2007
    • ACTION: Percivall to invite Els LeDrew to provide an UIC statement during the Opening Session
    • Session Leaders will need to provide one or two powerpoint (or other) pages summarizing the results of the session. These will be used in the ADC-6 meeting on Wednesday. George P. will consolidate all session inputs. Session leaders will be invited to speak to the session summary in ADC-6 if they are able to attend, else identify an alternate, or George will summarize.
  • Josh Lieberman asked if there had been specific direction from the UIC or ADC for the workshop:
    • The Workshop accepts the Core Architecture Implementation Report as a baseline for the workshop. The report includes current status and next steps. The report was briefed to the ADC Co-chairs in November.
    • The UIC and ADC have committed to collaboration on specific topics. The scenarios in the workshop are a result of this UIC/ADC collaboration. It is the aim of the workshop to inspire coordination between the AI Pilot as a cross-cutting integration task with the relevant UIC domain Tasks.
  • ACTION: All to aid in completing and correcting the table on task coordination
  • ACTION: Percivall to send Muchoney information about the Agriculture Monitoring scenario developers.
  • Call for Position Papers
  • To prepare for productive sessions, we are seeking position papers (1 to 3 pages) on the topics of the sessions.
  • Add a comment to a Session page and include a link to your paper.
  • Or, send your position paper to George Percivall and it will be posted and linked to a session page
  • ACTION: All are invited to post or provide position papers on topics for the sessions.
  • Any other business
  • Future Telecon: 12 February 2008, 1400 UTC

 



2008 January 08 - Telecon

DATE: Tuesday, 8 January 2008
TIME: 14:00:00 UTC
Check you local time here:
http://timeanddate.com/worldclock/fixedtime.html?month=1&day=8&year=2008&hour=14&min=0&sec=0&p1=0

WebEx logistics are provided below.

*** Draft Agenda

* ADC meeting and Architecture Workshop Logistics

- Architecture Workshop, Feb 4 and 5
- ADC-6 meeting, Feb 6 and 7
- hosted by EC/JRC, Ispra, Italy
- see previous message to AIP_plenary for workshop announcement
https://mail.opengeospatial.org/mailman/private/aip_plenary/2007-December/000078.html
- Participants should register before 15 January 2008.
https://jrc-meeting-registration.jrc.ec.europa.eu/

* Workshop Sessions

- Agenda and session descriptions drafted:
http://www.ogcnetwork.net/node/347
- UIC/ADC Scenario sessions
- Air Quality and Health: Phil Dickerson
- Agriculture Monitoring:
- Hurricane Disaster Response:
- Energy - Solar: Lionel Menard
- Biodiversity:
- Water/Drought monitoring: David Arctur
- Intercalibration - Stephen Ungar
- Implementation Sessions
- Initial Operating Capability:
- Clearinghouse, Catalogues, Registries:
- Test Facility and Service Registration:
- Sensors Interoperability: co-led by GEO Sensor Web Task
- Opening and Closing Plenaries

* Call for Position Papers

- To prepare for productive sessions, we are seeking position papers (1 to 3 pages) on the topics of the sessions.
- Send your position paper to George Percivall and it will be posted and linked to a Workshop Session or add a comment to a Session page and include a link to your paper.

* Any other business
- EGU Conference: http://meetings.copernicus.org/egu2008/
sessions of the new ESSI (Earth and Space Science Informatics)
http://www.cosis.net/members/meetings/programme/view.php?m_id=49&p_id=323&PHPSESSID=1be1da0a5bcbdd9681929a727bc69eac

- IEEE IGARSS: http://www.igarss08.org/
Abstract Submission: http://www.igarss08.org/Papers.asp

- Next Telecon: 22 January - 1400 UTC

 



Previous Telecons

Telecons before 2008 were not listed in on this page



WebEx Logistics

Topic: AR-07-02 AIP telecon
Date: Every Tuesday, from Tuesday, April 22, 2008 to no end date
Time: 4:00 pm, Europe Daylight Time (GMT +02:00, Amsterdam) Check your time below.
http://timeanddate.com/worldclock/fixedtime.html?month=4&day=22&year=2008&hour=14&min=0&sec=0&p1=0
Meeting Number: 705 531 081
Meeting Password: geoss0

Please click the link below to see more information about the meeting, including its agenda, or to join the meeting.

-------------------------------------------------------
To join the online meeting
-------------------------------------------------------
1. Go to https://geosec.webex.com/geosec/j.php?ED=105403992&UID=0&PW=af5bd1b1e5353520035e00
2. Enter your name and email address.
3. Enter the meeting password: geoss0
4. Click "Join Now".
5. Follow the instructions that appear on your screen.

-------------------------------------------------------
To join the teleconference only
-------------------------------------------------------
Call-in toll-free number (US/Canada): 866-469-3239
Call-in toll number (US/Canada): 1-650-429-3300
Global call-in numbers: https://geosec.webex.com/geosec/globalcallin.php?serviceType=MC&ED=105403992&tollFree=1
Toll-free dialing restrictions: http://www.webex.com/pdf/tollfree_restrictions.pdf

-------------------------------------------------------
For assistance
-------------------------------------------------------
1. Go to https://geosec.webex.com/geosec/mc
2. On the left navigation bar, click "Support".

You can contact me at:
oochiai@geosec.org

**************************
Osamu Ochiai
Senior Program Officer
Group on Earth Observations (GEO)
7 bis, avenue de la Paix, CP 2300
CH-1211 Geneva 2, Switzerland
+41 22 730 8443
oochiai@geosec.org
www.earthobservations.org
**************************


AttachmentSize
Testing of GEOSS Portal and Clearinghouse Solutions.txt3.06 KB
Achache GEOSS Common Infrastructure (GCI)3.pdf49.46 KB
OperationalTestGEOSS v32.doc37 KB
CFP2008 User Scenario template.doc183 KB
20080425 Plan for AIP CFP.doc128 KB
20080505 Plan for AIP CFP.doc147 KB
2008 Feb AR-07-02.doc207.5 KB
20080512 Plan for AIP CFP.doc149 KB
GCI open for business.pdf52.18 KB
8th ADC Announcement.pdf44.15 KB